Long leads are the same as leashes, but in XL sizes!These long leads are perfect for giving your pup that extra freedom, while ensuring you always maintain control. Long leads come standard with a handle and D ring.
* Length is total length of leash inlcuding handle (not including hardware)
1/2" Long Lead
PriceFrom C$45.00
0/500